Kit - BTS Signal Maintainers Storage 27511

20200213_163551
1
20200213_163458
2
20200214_053907
3
20200214_053929
4
20200214_055126
5
20200215_055951
6
20200215_061752
7
20200215_061805
8
20200216_071327
9
20200216_071908
10
20200216_071933
11
20200217_125224
12
20200217_125617
13
20200217_125623
14
20200217_131323 After installing the 'tar paper' roof on the platform roof.
15 After installing the 'tar paper' roof on the platform roof.
20200217_131910 After painting the tar paper roof flat black with acrylic craft paint.
16 After painting the tar paper roof flat black with acrylic craft paint.
20200217_131940
17
20200217_160145
18
20200217_162804
19
20200218_053219
20
20200218 174008
21 I ended up using CA to glue the stairs together. The wood glue took too long to set.
20200219 055322
22
20200219 062304
23
20200219 180607
24 After applying India Ink wash to the gray platform and stairs.
20200221 063747
25 Some of the cast metal detail pieces that came with the kit. The instructions mention a rat, but I did not find one.
20200221 064202
26 Soaking the cast metal pieces in white vinegar for a couple of minutes.
20200221 170532
27 I finished the railroad crossing signs. The slide-on decal lettering was challenging because they were so small and fragile.
20200221 170547
28
20200221 170539
29 The 'pigeons' are closer to roaster chicken size.
20200224 131252
30
20200224 131259
31
20200224 131312
32
20200224 131508
33
20200225 050658
34
20200225 061316
35
20200225 061336
36
20200225 061353
37
20200225 061425
38
20200225 061437
39
20200225 061449
40
20200225 061457
41